• Meridian Road between Fairview and Pine avenues, road closure through Oct. 14 for road rebuilding and sewer, water main installation.
  • Meridian Road between Franklin Road and Pine Avenue, road closure through Oct. 14 for road rebuilding and sewer, water main installation.
  • Fairview Avenue and Cherry Lane between Barbara Drive and Crestmont Drive, lane restriction through Sept. 23 for road rebuilding.
  • First Street Northwest between Cherry Lane and Elm Street, road closure through Sept. 11 for asphalt work.
  • Franklin Road between Linder and Ten Mile roads, mobile lane restriction with flagging through Sept. 30 for road rebuilding and sewer installation or repair.
  • Meridian Road between Fairview Avenue and James Court Drive, lane restriction with flagging and pedestrian restrictions through Sept. 15 for road rebuilding.
  • Linder Road between Almaden Drive and Sandy Court, lane restriction Monday through Aug. 31 for utility work.
  • Victory Road at Locust Grove Road to Meridian Road, road closure through Sept. 6 for road construction and utility work.
  • ¬†Franklin Road at Main Street to Northeast Fifth Street, lane restriction through Sept. 13 to install pedestrian signal.
  • Linder Road at Cherry Lane to Sandalwood Drive, lane restriction and pedestrian restrictions through Aug. 31 for concrete and asphalt work.

Comments

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.